Flagship asset · Project profile

CEM Rădeni

Strășeni District, Republic of Moldova · 78 ha · Operational since 2025

CEM Rădeni — aerial view of the solar park and BESS
50 MW solar · 75 MWh BESS · 75,000+ modules
Rădeni BESS storage system with the solar park behind
BESS · 47.5 MW / 75 MWh LiFePO₄
CEM Rădeni — 110 kV transformer and grid substation
Transformer · ELPROM 110 kV
CEM Rădeni 110 kV grid substation
Grid substation · 110 kV
BESS containers with the solar park behind
Storage and generation on one site

Key figures

§ 01
50 MW
Installed capacity
47.5 MW
BESS power
75 MWh
BESS storage
24 MW
Contracted PPA
78 ha
Project area
10 MW
Gas generation
75,000 MWh
Est. annual production
30,000 t
CO₂ avoided / year

About the project

§ 02

CEM Rădeni is Moldova's largest solar energy complex — 50 MW of installed photovoltaic capacity combined with a 75 MWh BESS grid-scale storage system. Located in Strășeni district, the plant was approved as a national strategic project under Government Decision 83/2025 and financed by MAIB, Moldova's largest bank.

The project was the winning bid at Moldova's first public renewable energy auction (31 March 2025), organized by the Ministry of Energy. GS Blue Electric — as part of the 'Lumina Noastră' Consortium — secured the largest single award at 50 MW installed capacity.

The BESS storage system is part of the same asset: 60 MWh commissioned in March 2026 and extended by 15 MWh in August 2026, to 75 MWh of LiFePO₄ storage (47.5 MW). It provides balancing and ancillary services to the grid. A further 20 MWh extension is planned for Q1 2027, bringing the total to 95 MWh.

Since December 2026, the complex also includes 10 MW of flexible gas generation — three Jenbacher J620 engines — for dispatchable balancing and peak demand support.

BESS inauguration →
Jinko Solar Tiger Neo Huawei FusionSolar BESS LiFePO₄ 110 kV
Technology
PV panelsJinko Solar Tiger Neo
Panel efficiency>23%
InvertersHuawei 330 kW
BESSLiFePO₄, 47.5 MW / 75 MWh
Gas engines3 × Jenbacher J620 · 10 MW
Grid connection110 kV
TransformerELPROM Heavy Industries
SwitchgearSiemens 30 kV
Financing
Lead bankMAIB
Financing typeGreen loan
Tenor8 years
Regulatory statusHG 83/2025

Project timeline

§ 03
2024
Company incorporated
GS Blue Electric incorporated. 100% local capital. Four founding partners.
31 March 2025
Public auction won — Large Eligible Producer
First public auction by the Ministry of Energy. Status guarantees market access and revenue visibility.
2025
Government Decision 83/2025 — national strategic project
CEM Rădeni declared a national strategic project. Regulatory protection and grid connection priority.
July 2025
CEM Rădeni solar park operational — 50 MW
Moldova's largest solar facility commissioned. 15-year PPA with the Moldovan offtaker in force.
March 2026
BESS Rădeni operational — 60 MWh
60 MWh LiFePO₄ grid storage commissioned. Grid balancing and ancillary services active.
July 2026
Public auction won — 12 MW wind
12 MW of wind capacity with a 15-year PPA.
August 2026
BESS Rădeni expansion — 15 MWh
Expansion of battery storage capacity, further strengthening dispatchability and ancillary service revenues.
December 2026
Flexible gas generation operational — 10 MW
3 × Jenbacher J620 gas engines commissioned at Rădeni for dispatchable balancing and peak demand support.
Q1 2027 — planned
BESS Rădeni expansion — +20 MWh
Additional LiFePO₄ storage, bringing total capacity to 95 MWh.
Q1 2028 — planned
Wind park in service — 12 MW
Commissioning of the wind capacity secured at auction, under a 15-year PPA.

Location

§ 04
CEM Rădeni · Strășeni District, Republic of Moldova Open in Google Maps ↗

Gallery

§ 05
CEM Rădeni — module fotovoltaice
CEM Rădeni — vedere de ansamblu
CEM Rădeni — 110 kV transformer and grid substation
CEM Rădeni — Siemens 30 kV switchgear room
CEM Rădeni — echipamente
BESS Rădeni
Full photo gallery →