Investor relations

A bankable, government-approved energy platform

National strategic project · MAIB-financed · Large Eligible Producer · European grid standards.

The platform at a glance

§ 01
50MW
Installed capacity
75MWh
BESS operational
75,000MWh
Est. annual production
24MW
Contracted PPA
Investment case§ 02

Why GS Blue Electric

01
Flagship asset

Moldova's largest solar + storage hybrid hub

50 MW solar PV fully operational since 2025 alongside 75 MWh of LiFePO₄ BESS — the first utility-scale dispatchable renewable asset in the country.

50
MW solar
75
MWh BESS
02
Revenue

De-risked revenue — 15-year PPA

24 MW secured under a 15-year fixed-price PPA (1.1899 MDL/kWh) provides stable cashflows, while merchant volumes capture market upside. Large Eligible Producer status guarantees market access.

24 MW
contracted PPA
15
years · fixed price
03
Flexibility

Gas balancing capacity

10 MW Jenbacher peaker, operational since December 2026 — fast-start dispatch to monetise scarcity and reserve markets.

10 MW
peaker
3 ×
Jenbacher J620
04
Growth

Contracted growth — 12 MW wind

12 MW of wind capacity secured at the July 2026 public auction under a 15-year PPA, with commissioning planned for Q1 2028 — extending the platform beyond solar and storage. A further 20 MWh of BESS expansion is planned for Q1 2027.

12 MW
wind · 15-yr PPA
+20
MWh · BESS expansion · Q1 2027
05
Regulatory framework

Government-backed strategic project

Government Decision 83/2025 confers regulatory protection and grid connection priority for CEM Rădeni.

HG 83
2025
06
Financing

MAIB-financed — due diligence completed

Moldova's largest bank as financial partner signals completed banking due diligence, reducing perceived risk for institutional co-investors.

MAIB
lead bank
8
years · tenor
07
Equipment

Tier-1 equipment, institutional quality

Jinko Solar Tiger Neo bifacial panels, Huawei FusionSolar inverters and LiFePO₄ BESS cells.

Tier-1
suppliers
08
Market context

EU integration tailwinds

Moldova's 30% renewable target by 2030 and the EU accession process create a structurally favorable investment environment.

30%
RES target 2030
EU
grid standards
Project stages§ 03

Development delivered according to plan.

2024
Company incorporated
GS Blue Electric incorporated. 100% local capital. Four founding partners.
31 March 2025
Public auction won — Large Eligible Producer
First public auction by the Ministry of Energy. Status guarantees market access and revenue visibility.
2025
Government Decision 83/2025 — national strategic project
CEM Rădeni declared a national strategic project. Regulatory protection and grid connection priority.
July 2025
CEM Rădeni solar park operational — 50 MW
Moldova's largest solar facility commissioned. 15-year PPA with the Moldovan offtaker in force.
March 2026
BESS Rădeni operational — 60 MWh
60 MWh LiFePO₄ grid storage commissioned. Grid balancing and ancillary services active.
July 2026
Public auction won — 12 MW wind
12 MW of wind capacity with a 15-year PPA.
August 2026
BESS Rădeni expansion — 15 MWh
Expansion of battery storage capacity, further strengthening dispatchability and ancillary service revenues.
December 2026
Flexible gas generation operational — 10 MW
3 × Jenbacher J620 gas engines commissioned at Rădeni for dispatchable balancing and peak demand support.
Q1 2027 — planned
BESS Rădeni expansion — +20 MWh
Additional LiFePO₄ storage, bringing total capacity to 95 MWh.
Q1 2028 — planned
Wind park in service — 12 MW
Commissioning of the wind capacity secured at auction, under a 15-year PPA.
Grid context§ 04

ENTSO-E integration and export corridors

Moldova's power system is synchronised with ENTSO-E via Romania and Ukraine. Three 400 kV interconnections expand transfer capacity and open regional market access for merchant volumes.

Vulcănești – Isaccea
400 kV · Moldova – Romania
The main import corridor from the ENTSO-E system, normally carrying 60–70% of consumption on the right bank of the Dniester.
Bălți – Suceava
400 kV · 48 km · 12 localities
Completion planned 2027
Total cost EUR 77 million — a EUR 15.4 million EU grant, a EUR 30.8 million EBRD loan and EUR 30.8 million from the European Investment Bank. It will raise import and export capacity and allow more renewable generation to be integrated.
Strășeni – Gutinaș (Liberty Line)
400 kV · ~70 km in Moldova
Feasibility study completed · June 2026
The third high-voltage interconnection with the European system through Romania, financed by a USD 130 million grant from the U.S. Government. The route crosses 25 localities including Strășeni district, where CEM Rădeni is located.

Sources: gov.md — Liberty Line feasibility study (18.06.2026) · Ministry of Energy — EBRD tender, Bălți–Suceava (31.07.2025). Infrastructure operated by Moldelectrica; information current as at August 2026.

Request investor materials

Pitch deck, financials and due diligence package available.

Contact our CFO for investor materials, financial projections, and structured financing discussions.