CEM Rădeni — parc solar aerian, Strășeni, Moldova
Moldova's largest solar energy park with storage

Building Moldova's
energy future

Renewable energy and modern infrastructure for the energy stability and independence of the region.

50MW
Installed capacity
75MWh
BESS storage
75,000MWh
Est. annual production
20,000+
Households powered
Platform overview§ 01

Moldova's first integrated energy-infrastructure platform, built to institutional standards with local capital.

Founded in 2024, GS Blue Electric was structured from the outset as a long-term energy infrastructure platform — not a project developer, but a strategic asset operator built to European standards.

Our flagship asset — the CEM Rădeni solar and BESS complex in Strășeni — is approved as a national strategic project by Government Decision 83/2025 and financed by MAIB, Moldova's largest bank.

Rădeni BESS storage system with the solar park behind
BESS · 47.5 MW / 75 MWh LiFePO₄
CEM Rădeni — 110 kV transformer and grid substation
Transformer · ELPROM 110 kV
CEM Rădeni 110 kV grid substation
Grid substation · 110 kV
BESS containers with the solar park behind
Storage and generation on one site
CEM Rădeni — aerial view of the solar park and BESS
50 MW solar · 75 MWh BESS · 75,000+ modules

Flagship asset

§ 02
Operational Flagship asset
CEM Rădeni — complexul solar și sistemul de stocare BESS, Strășeni

CEM Rădeni

Strășeni District · Republic of Moldova
50 MW
Solar capacity
75 MWh
BESS · 47.5 MW
78 ha
Site area
24 MW
Contracted PPA
75,000+
Solar modules
30,000 t
CO₂ avoided / year

Approved under Government Decision 83/2025 as a national strategic project. Financed by MAIB. 75,000+ Jinko Solar Tiger Neo modules · Huawei FusionSolar inverters · 10 MW gas generation (3 × Jenbacher J620).

Full project profile →
Strategic importance§ 03

A bankable, government-approved infrastructure asset.

01
National strategic project
HG 83/2025
02
Government approval
Government of the Republic of Moldova
03
MAIB financing
Moldova's largest bank
04
Long-term PPA — 24 MW
Power purchase agreement
05
European grid integration
ENTSO-E grid standards
06
Large Eligible Producer
Regulated market status
Government Decision 83/2025 Public tender won · March 2025 MAIB-financed 100% local capital Built in Moldova. Powered for Europe.
Integrated platform§ 04

A complete energy system — from generation to market.

01

Solar

50 MW of bifacial photovoltaic generation.

02

Storage & balancing

75 MWh LiFePO₄ BESS and 10 MW of gas for balancing.

03

Grid

Grid integration to European standards.

04

Energy management

Dispatch, trading and optimisation.

In development — BESS expansion · +20 MWh · Q1 2027 Wind · 12 MW · Q1 2028
Technology§ 05

High-performance equipment. Global suppliers.

01
Photovoltaic

Jinko Solar Tiger Neo

75,000+ monocrystalline panels with efficiency above 23%. Latest-generation bifacial PERC+ technology, optimised for maximum yield at variable irradiance.

75k+
Units
>23%
Efficiency
02
Power conversion

Huawei FusionSolar 330 kW

Centralised 330 kW inverters with AI-based MPPT optimisation, smart-grid compliance and remote O&M via the FusionSolar cloud platform.

330
kW · per unit
AI
MPPT
03
Grid storage

BESS LiFePO₄ — 75 MWh

Operational from March 2026. Frequency regulation, peak shaving and renewable integration. A further 20 MWh expansion planned for Q1 2027.

75
MWh · operational
+20
MWh · Q1 2027

Strategic partners & financing

§ 06
MAIB
Huawei
Jinko Solar
Ministry of Energy RM
Government of Moldova
All partners →
Open for institutional investment

A bankable, government-approved energy platform.

National strategic project · MAIB-financed · Large Eligible Producer · European grid standards — open to long-term institutional capital.